Our designs

Three designs, made for real families.

Every KĒĒP unit is a permitted, permanent home — designed for the way Southern California families actually live.

The designs

Renders and floor plans.

Render of the Companion — a compact studio/1BR ADU with covered porch and zero-step entry

Studio / 1BR

Companion

$190,000

from · 400–550 sf · 7–9 months

  • ✦All-in — design, permits, materials, build
  • ✦Zero-step entry option for aging-in-place
  • ✦Full kitchen and private entrance
  • ✦Single-story, wheelchair-ready layout

Renders and floor plans are design concepts; finishes and siting vary by project.

Render of the Starter — a 1-2 bedroom ADU with private entrance and full kitchen

1BR / 2BR

Starter

$260,000

from · 550–750 sf · 8–10 months

  • ✦All-in — design, permits, materials, build
  • ✦One- or two-bathroom option
  • ✦Full kitchen, private entrance, own laundry
  • ✦Most popular unit for adult children and rentals

Renders and floor plans are design concepts; finishes and siting vary by project.

Render of the Homestead — a spacious 2+ bedroom ADU with covered patio dining area

2BR+

Homestead

$350,000

from · 750–950 sf · 10–14 months

  • ✦All-in — design, permits, materials, build
  • ✦Two bedrooms, two baths
  • ✦Custom finishes available
  • ✦Room for a full family or long-term tenant

Renders and floor plans are design concepts; finishes and siting vary by project.

Before and after

The same backyard, eight months apart.

Before
After

Illustrative concept of a typical KĒĒP build — not a photograph of a completed project.

Build diary

What your build will look like.

  1. Week 1 · Property Check

    Property assessment in 48 hours

    We pull zoning, setback, and utility data for your lot and deliver a written Property Check report — what's possible, and a preliminary price range — two days after your first call.

  2. Week 6 · Design & Permits

    Design sign-off, permit package to the city

    After two design reviews with you, we lock the final layout and send the full permit package to the city. Weekly updates start every Friday.

  3. Week 14 · Procurement

    All materials purchased before ground breaks

    With permits in hand, KĒĒP purchases every material for your project up front — framing, windows, fixtures, finishes. From this point your materials cost is locked and cannot change.

  4. Week 20 · Build

    Framing goes up, photos every Friday

    KĒĒP's contractor network frames your unit using KĒĒP-sourced materials. You receive a photo and written update every Friday throughout.

  5. Week 32 · Build

    Walkthrough and punch list before final payment

    Before the final invoice, KĒĒP walks the finished unit with you. Every punch-list item is completed before payment — standard policy on every KĒĒP project.

Where we build

Twenty cities across Southern California.

Don't see your city?

These are the cities we cover in depth, but we build across Southern California. Tell us your address and we'll confirm what's possible in your free 48-Hour Property Check.